Status

Planned multi-switch lab. No completed EtherChannel result is claimed yet.

Goal

Bundle two physical links between two isolated lab switches into one logical Port-Channel using LACP and compare the result with separate redundant trunks controlled by STP.

Prerequisites

Planned Topology

Catalyst 3560CX-1
   Gi0/X ===== Gi0/X
   Gi0/Y ===== Gi0/Y
          LACP
Catalyst 3560CX-2

Copper links are preferred for the first implementation because they reduce cost and remove unnecessary SFP and fiber variables.

Initial Baseline

Before creating the channel, capture on both switches:

show interfaces status
show interfaces trunk
show interfaces switchport
show spanning-tree summary
show etherchannel summary
show interfaces counters errors
show running-config | section interface

Verify that both candidate interfaces are dedicated to the isolated lab and are not part of an existing channel.

Change Plan

  1. verify matching interface characteristics on both switches
  2. configure LACP active mode on the intended member links
  3. configure the logical Port-Channel as the trunk
  4. use VLAN 998 as the matching unused native VLAN
  5. allow only VLANs 10, 20, 30, 99 and 998
  6. verify that all members bundle successfully
  7. test one-member failure and recovery
  8. save only after validation

Example LACP Pattern

Exact interfaces and command order must be verified for the installed IOS release.

conf t

interface range GigabitEthernet0/X - Y
 description LAB_LACP_MEMBER
 channel-group 1 mode active
 no shutdown

interface Port-channel1
 description LAB_TRUNK_TO_SECOND_SWITCH
 switchport mode trunk
 switchport trunk native vlan 998
 switchport trunk allowed vlan 10,20,30,99,998
 no shutdown

end

Apply a compatible configuration on the second switch. Member interfaces must have matching Layer 2 characteristics, and the Port-Channel trunk configuration must match on both ends.

VLAN 998 should have no SVI and no connected end devices. Management remains in VLAN 99.

Verification

show etherchannel summary
show etherchannel port-channel
show interfaces port-channel 1
show interfaces trunk
show interfaces switchport
show spanning-tree
show interfaces counters errors
show logging

For the failure test:

  1. confirm the Port-Channel is forwarding normally
  2. disconnect one physical member
  3. verify that the logical Port-Channel remains operational through the other member
  4. reconnect the member
  5. verify that it rejoins the bundle without errors

Learning Goals

Success Criteria

Rollback

  1. disconnect one member so only a single known path remains
  2. remove the channel-group association only from the dedicated lab member interfaces
  3. restore the recorded single-trunk or disconnected baseline
  4. verify STP, trunk and management state
  5. save only after the restored state is confirmed

Do not use broad interface cleanup commands without first comparing the affected ports with the recorded baseline.

Evidence to Record

Publish only sanitized evidence:

Safety

Build and verify the Port-Channel only on isolated lab ports. Do not connect a second parallel link to the productive LAN before STP and EtherChannel behavior are understood and checked.