Network Design

Design principle

Start with the simplest recoverable design and add segmentation only after the single-node baseline is stable.

Every bridge, VLAN or management-address change requires a documented rollback and a local or independent console path before implementation.

Stage 1: access-port baseline

home or lab gateway
        |
Cisco lab switch
        |
single access port in VLAN 20
        |
future Proxmox host
        |
default Linux bridge
        |
initial VM and LXC

This is the first implementation target. It does not require a Cisco router, an 802.1Q trunk or a VLAN-aware bridge.

Acceptance criteria:

Stage 2: management separation

Stage 3: optional VLAN trunk

Planned VLAN roles

VLAN Role Proxmox use Status
20 LAB initial access-port baseline and general lab guests planned
30 SERVERS_GUESTS later server and guest services planned
99 MGMT tagged host management after separation is validated planned
998 NATIVE_UNUSED no SVI, host address or guest assignment planned trunk control
999 BLACKHOLE none; Cisco-side parking VLAN for unused access ports Cisco-side roadmap

Recovery order for network changes

  1. record the current switch port and Proxmox bridge state
  2. confirm physical or out-of-band console access
  3. prepare the Cisco rollback commands in cisco-switching-lab
  4. change one layer at a time
  5. verify link, management reachability, gateway, DNS and NTP
  6. verify guest VLAN behavior separately
  7. roll back immediately if the management path becomes ambiguous

Repository boundary

Cisco switch configuration belongs in cisco-switching-lab. This document covers the Proxmox-side design, dependency order, acceptance criteria and recovery requirements.